Panels and wiring
Panel upgradesBreaker replacementWhole-house rewiringAluminum wiring replacementElectrical wiringNew and dedicated circuitsRepairs and safety
Electrical troubleshootingElectrical repairs24-hour electricianElectrical inspectionsOutlets, GFCI and AFCISmoke and CO detectorsWhole-home surge protectionLighting and fans
Recessed and indoor lightingLED lightingLighting repairsCeiling fansLandscape lightingSecurity lightingLow-voltage lightingPower, pool and remodels
EV charger installationGenerator hookupsPool, spa and hot tub wiringPool light installationRemodels and custom homesCommercial
Commercial electricianTenant improvementsIndustrial controlsHome / Service Areas / Surprise / EV charger installation
Adding a home EV charger in Surprise starts with one question: can your panel carry it? Call and talk to a real person, and you hear the price before anyone drives out.
Surprise grew from about 30,800 residents in 2000 to 143,148 in 2020, so many homes here have garages built in the last twenty five years. That helps with EV charging, because a newer home often has a panel with some room to spare. It is not certain, so we check before recommending anything.
A Level 1 charger plugs into a regular outlet and charges slowly. A Level 2 charger needs its own 240 volt circuit, much like a dryer or range. Installing one means confirming the panel has capacity, choosing where the charger mounts, and running the circuit to it. If your panel is full, we explain your options, and a panel upgrade is only one of them.
A new circuit for a charger is electrical work inside the City of Surprise, which is permitted through the Community Development Department. Surprise is served by APS. If you are thinking about when to charge, ask APS which rate plans fit your schedule.
A real person answers any hour. You hear the price before we come out, and our work carries a two-year warranty on labor and material.
AZ ROC #341966. Licensed, bonded and insured. Based in El Mirage.
Level 1 uses a regular 120 volt outlet and charges slowly. Level 2 uses a dedicated 240 volt circuit and charges much faster. Most homeowners who drive daily choose Level 2.
A new 240 volt circuit for a charger is electrical work that is generally permitted through the City of Surprise Community Development Department. We tell you what your job needs.
Not always. Many panels have enough capacity for a charger. We look at what is already connected before recommending anything.
Yes. Tell us the make and model on the phone, and we will make sure the circuit matches what it needs.
Yes. Pricing is given before dispatch. There is a trip and diagnostic fee that depends on distance, and nights and weekends cost more. You hear all of that on the phone before anyone drives out.
Nearby areas we serve
Sun City, Sun City West, Sun City Grand, Surprise, El Mirage and Peoria. Call or text any hour.
Leave your number and we will call you back within a few hours.
Prefer to talk now? Call (602) 999-2770